
Group work needs everyone at the same door. A dealer day, a factory visit, a school party, a fair and a concert are the usual examples. If the list and the stop order arrive early, the cars are set to them.
A long Sprinter is often enough up to ten people. Two hotels need two cars or one sequenced loop. If the concert exit is not a fixed hour, the waiting window is written first. The invoice name can sit in the same message as the programme.